8 in Diamond Core Bit Rental in Brooklyn, NYC
The 8 in diamond core bit cuts a round hole about 8 in across through concrete, block, brick and stone on a core drill. It has 16 diamond teeth and a 15 3/4 in overall length. Rent it from our Brooklyn yard at 181 2nd Ave, or have it delivered with your drill anywhere in the five boroughs. Call 718-344-1474.
8 in core bit for a yard storm drain through a foundation
A Howard Beach homeowner keeps getting water in the cellar when the back yard floods, so the contractor puts in a yard drain and runs a 6 in PVC storm line through the foundation wall. 6 in Schedule 40 PVC measures 6.625 in on the outside. An 8 in core leaves about 11/16 in each side, the kind of gap a rubber link seal is made for. A link seal squeezes tight against the pipe and the concrete, so the hole stays watertight even if the pipe moves a little.
Tip: Link seals come in sizes for each pipe and hole combination. Check the seal maker’s chart and pick the bit to match it. The 48 in core drill rig handles bits up to 8 in.
Is 8 in the right size?
Measure the outside of the pipe, duct or sleeve that has to fit, not the size printed on it. Then leave room for sealant, grout or firestop around it. In the job above, that works out to about 11/16 in each side.
- Bigger pipe or duct? Try the 10 in diamond core bit. Its usual job: makeup air for a small cafe hood (8 in round duct plus sleeve).
- Smaller pipe or duct? Try the 6 1/2 in diamond core bit. Its usual job: kitchen range hood (6 in round duct).
- See every size and what it fits in our core bit size chart.
Specifications and Features
Rental Details
Which drill: for a bit this size, use a 36 in core drill rig or the 48 in EDCO rig (up to 8 in) for straight holes in slabs and thick walls. Already have a drill? Tell us the model when you request a quote and we will check that the bit fits it.
Drill wet. Keep water running to cool the bit and keep silica dust down, and read the OSHA guidance on crystalline silica before you start. Scan slabs for rebar, conduit and post-tension cables before you core a floor.



