This core bit size chart shows which diamond core bit to rent for the pipe, conduit, duct or sleeve going through your wall or floor. Each size has a real NYC job behind it, and the math uses the actual outside diameter of the pipe. American Tool Rental rents 17 sizes from 1 in to 12 in from our Brooklyn yard, with delivery to all five boroughs. Call 718-344-1474 or request a quote.
How to pick the right core bit size
A core bit cuts a hole about the size on its label. Measure the outside diameter (OD) of whatever has to go through, not the size printed on it. Subtract it from the bit size and split the difference in two: that is the gap on each side for sealant, grout or firestop. About 1/8 in each side lets a pipe slide through easily.
Core bit size chart
The bit is always bigger than the pipe size. A 4 in cast iron pipe needs a 5 in bit, and a 4 in dryer duct needs a 4 1/2 in bit. Find your pipe or duct in the middle column, then read the bit size on the left.
| Bit | Job | What goes through | Gap each side |
|---|---|---|---|
| 1 in | Porch light or camera on a brick front | 1/2 in EMT conduit, 0.706 in OD | about 5/32 in |
| 1 1/4 in | AC condensate drain through a concrete wall | 3/4 in PVC, 1.050 in OD | about 3/32 in |
| 1 1/2 in | Gas line to a backyard grill | 1/2 in gas pipe in a 1 in steel sleeve, 1.315 in OD | about 3/32 in |
| 1 3/4 in | Feeder to a new sub-panel | 1 1/4 in EMT conduit, 1.510 in OD | about 1/8 in |
| 2 in | Sprinkler branch line through a block wall | 1 1/4 in steel pipe, 1.660 in OD | about 5/32 in |
| 2 1/2 in | Stoop railing posts | 1 1/2 in steel pipe post, 1.900 in OD | about 5/16 in |
| 2 3/4 in | Ductless mini-split line set | Line set, drain and cable bundle in a wall sleeve | room for the sleeve |
| 3 in | Water line through a brick cellar wall | 2 1/2 in Type L copper, 2.625 in OD | about 3/16 in |
| 3 1/2 in | Small bathroom exhaust fan | 3 in round duct | about 1/4 in |
| 4 in | Concrete test core for an engineer | Takes out a core just under 4 in across | n/a |
| 4 1/2 in | Dryer vent | 4 in rigid metal duct | about 1/4 in |
| 5 in | Waste stack through a floor slab | 4 in no-hub cast iron, 4.38 in OD | about 5/16 in |
| 6 in | Water service sleeve through a foundation | 3 in ductile iron in a 5 in steel sleeve, 5.563 in OD | about 7/32 in |
| 6 1/2 in | Kitchen range hood | 6 in round duct | about 1/4 in |
| 8 in | Yard storm drain through a foundation | 6 in PVC, 6.625 in OD | about 11/16 in |
| 10 in | Makeup air for a small cafe hood | 8 in round duct plus sleeve | about 1 in to the duct |
| 12 in | Boiler room combustion air after a boiler upgrade | 10 in round duct plus sleeve | about 1 in to the duct |
Not sure which size? Tell us the pipe, duct or sleeve, the wall or floor material and how thick it is, and we will match the bit and drill. Call 718-344-1474 or request a quote.
What each core bit size is for
1 in: a porch light or camera on a brick front
A Carroll Gardens brownstone owner wants a security camera and a new porch light by the front door. 1/2 in EMT measures 0.706 in on the outside, so a 1 in core leaves about 5/32 in all around. Rent the 1 in core bit.
1 1/4 in: an AC condensate drain through a concrete wall
A Midtown office adds an air handler in a closet, and the 3/4 in PVC condensate drain has to pass through a poured concrete wall to reach a floor drain on the other side. A 1 1/4 in core leaves about 3/32 in each side, a snug fit that seals with a bead of silicone and needs no patching. Rent the 1 1/4 in core bit.
1 1/2 in: a gas line to a backyard grill
A Bay Ridge homeowner wants a built-in gas grill on the patio, fed from the meter in the cellar. The 1 in steel sleeve around the 1/2 in gas pipe is 1.315 in on the outside, so a 1 1/2 in core leaves about 3/32 in each side, a snug fit for setting the sleeve in sealant or mortar. Rent the 1 1/2 in core bit.
1 3/4 in: a feeder to a new sub-panel
A woodworking shop moves into a Sunset Park warehouse unit and needs its own sub-panel. 1 1/4 in EMT is 1.510 in on the outside, so a 1 3/4 in core leaves about 1/8 in each side. Rent the 1 3/4 in core bit.
2 in: a sprinkler branch line through a block wall
A Manhattan office fit-out extends the sprinkler system into a new row of offices, and a 1 1/4 in branch line has to cross a concrete block corridor wall. A 2 in core leaves about 5/32 in each side, inside the gap range many firestop sealants allow for small steel pipe through a rated wall. Rent the 2 in core bit.
2 1/2 in: stoop railing posts
The iron railings on a Bed-Stuy brownstone stoop have rusted through at the base, and the new railing has 1 1/2 in steel pipe posts (1.900 in OD). Each post gets a 2 1/2 in core about 4 to 5 in deep into the stoop. Rent the 2 1/2 in core bit.
2 3/4 in: a ductless mini-split line set
An Astoria apartment is replacing its window units with a ductless mini-split. Most small wall-mount units call for a hole of about 2 1/2 to 2 9/16 in (65 mm), and the 2 3/4 in core leaves a little extra room for the plastic wall sleeve that protects the bundle. Rent the 2 3/4 in core bit.
3 in: a water line through a brick cellar wall
A Crown Heights mixed-use building runs a bigger water line to a new storefront tenant through the old brick wall that divides the cellar. The 2 1/2 in Type L copper is 2.625 in on the outside, so a 3 in core leaves about 3/16 in each side to wrap the copper where it passes through the brick. Rent the 3 in core bit.
3 1/2 in: a small bathroom exhaust fan
A Bed-Stuy brownstone bathroom renovation adds a small exhaust fan, and its 3 in round duct has to go out through the rear brick wall to a wall cap. A 3 1/2 in core leaves about 1/4 in around the duct for mortar or sealant behind the cap flange. Rent the 3 1/2 in core bit.
4 in: a concrete test core for an engineer
A Bushwick warehouse is being turned into offices with a new mezzanine, and the engineer wants to know how strong the existing slab is before it takes new loads. A 4 in bit is the common choice because the core it takes out is a little under 4 in across, and the test standard (ASTM C42) asks for cores at least 3.70 in across. Rent the 4 in core bit.
4 1/2 in: a dryer vent
A Ditmas Park family moves the laundry into the basement, and the dryer has to vent through the concrete foundation wall. The 4 in rigid metal dryer duct needs a 4 1/2 in core, which leaves about 1/4 in all around to slide it through and seal it. Rent the 4 1/2 in core bit.
5 in: a waste stack through a floor slab
In a Manhattan gut renovation, the bathrooms are moving, and a new 4 in waste stack has to drop through the 8 in concrete floor slab. A 5 in core leaves about 5/16 in each side for the firestop sealant that keeps the floor’s fire rating. Rent the 5 in core bit.
6 in: a water service sleeve through a foundation
A new four-story building in Bushwick is bringing a 3 in water service in from the street through the cellar foundation wall. It runs 3 in ductile iron inside a 5 in steel sleeve (5.563 in OD), and the 6 in core leaves about 7/32 in around the sleeve to set it in the wall. Rent the 6 in core bit.
6 1/2 in: a kitchen range hood
A Park Slope kitchen renovation adds a range hood that vents outside through the brick wall behind the stove. A 6 in hole would be too tight, so a 6 1/2 in core leaves about 1/4 in all around for the duct, a sleeve or sealant. Rent the 6 1/2 in core bit.
8 in: a yard storm drain through a foundation
A Howard Beach homeowner keeps getting water in the cellar when the back yard floods, so the contractor puts in a yard drain and runs a 6 in PVC storm line through the foundation wall. An 8 in core leaves about 11/16 in each side, the kind of gap a rubber link seal is made for. Rent the 8 in core bit.
10 in: makeup air for a small cafe hood
A small Williamsburg cafe hood pulls more air out than the room can replace. An 8 in makeup air duct goes through the brick side wall in a sleeve, and a 10 in core leaves about 1 in from the duct to the brick on each side. Rent the 10 in core bit.
12 in: boiler room combustion air after a boiler upgrade
A six-family building in the Bronx is replacing an old No. 4 oil burner, and the new boiler needs a 10 in combustion air duct through the foundation wall. A 12 in core leaves about 1 in from the duct to the concrete on each side for the sleeve and sealant. Rent the 12 in core bit.
Before you core
- Scan slabs first. Rebar, conduit and post-tension cables run through concrete floors. Have the slab scanned with GPR or X-ray before you core it.
- Drill wet. Water cools the bit and keeps silica dust down. Read the OSHA guidance on crystalline silica.
- Thick walls. Our bits are 15 3/4 in long. Add a 6 in extension or a 12 in extension for deeper cores.
- Pick the drill. Use the EDCO handheld core drill for walls and tight spots, the 48 in EDCO rig for bits up to 8 in, or the 36 in core drill rig for holes from 1 in to 12 in.
- Licensed work. Gas, plumbing, sprinkler and electrical work in NYC is done by licensed trades. Get the hole size from their drawings or their sleeve.
Frequently asked questions
What size core bit do I need for a 4 in pipe?
It depends on the pipe. 4 in no-hub cast iron is 4.38 in on the outside, so a 5 in bit leaves about 5/16 in each side for firestop. 4 in PVC is 4.5 in on the outside and also goes in a 5 in hole, with a tighter 1/4 in gap. Always measure the outside of the pipe you are installing.
Why is the pipe bigger than its size?
Pipe is named by a nominal size, not its outside diameter. 2 in steel or PVC pipe is 2.375 in on the outside, and 2 in copper tube is 2.125 in. EMT conduit has its own sizes too. Pick the bit from the outside diameter.
How much gap should I leave around a pipe?
About 1/8 in each side lets a pipe slide through and take sealant. Firestop systems and rubber link seals each list a minimum and maximum gap, so check the product you are using and pick the bit that lands inside its range.
How long are your core bits?
Our bits are 15 3/4 in long overall, and the usable drilling depth is a little less than that. For thick foundation walls or old brownstone walls, add a 6 in or 12 in core bit extension.
Do you deliver core drills and bits in NYC?
Yes. Pick up at our Brooklyn yard at 181 2nd Ave, or we deliver to Brooklyn, Manhattan, Queens, the Bronx and Staten Island. Call 718-344-1474 for availability and rates.